Cats Protection - New Care Annexe and Reception Extension
Ashbourne, Derbyshire
Project Value: £400,000.00

Case Studies

To provide a new, separate Cat Isolation Annexe, for infection control, with a separate Maternity Unit.

To extend the existing Reception Area for new
customer interface. Structure is a timber frame and timber clad solution, forming specialist provision for bespoke animal care and well-being.

Works are ongoing, and involve specialist underfloor, and undercage heating systems, direct driven from an Air Source Heat pump, separate ventilation and extraction control, hygiene controlled cat run areas.

 

 

 

Client Feedback

"Further to working as the main contractor on the project to build a new isolation block and office extension at our Derby Adoption Centre, I just wanted to express my thanks to you and all your tem for the very 'hands-on', practical and professional way in which the job was handled. To have undertaken a project of this size and complexity in an operational cattery without there being any significant disruption to the work of my colleagues on site speaks volumes for the degree of customer care that has been shown.

Your willingness to respond to changes required by Cats Protection and also in seeking sensible work-rounds to unforeseen eventualities during the project was most refreshing to experience. I hope that we will have the opportunity of working on another project at some point.."

"Particularly good customer service and very good on-site supervision. Would not hesitate to use Carter Constrcution again."

Simon Haste - Head of Property

 

St. John's Church - New Assembly and Entrance Area
Mickleover, Derbyshire
Project Value: £120,00.00

Case Studies

Full Design and Build Project to provide a new improved entering facility, with auto-doors and raised doorheads.

Facility to be extended for communal use, assembly and public usage.

Works involved the dismantling of an existing
CLASP link unit, and the in-filling with a traditionally
built masonry solution, feature entrance and screen elevations and new services.


 

 

Client Feedback

Although there was some delay in starting the project, due to earlier adverse weather conditions, all work was completed on time.
The contractor was very accommodating in fitting the work round church activities, thus causing little inconvenience during the work.
The quality of the design and finished product are excellent and far exceeded our expectations.

Brian Seagar - Employer’s representative / Vice chairman PCC St John’s Mickleover.

 

New Entrance Vestibule – Our Lady of Lourdes
Mickleover, Derbyshire
Project Value: £140,000

Case Studies

Project: New Entrance Vestibule, Mickleover, Derbyshire

Working on behalf of Our Lady of Lourdes, Carter Construction was appointed as the Principal Contractor for the construction of a new entrance vestibule.

The construction incorporated a new entrance vestibule formed from steel frame and complex foundations. Masonry and stone construction to form feature details, standing seam copper roof, detailed fascias and specialist oak windows and doors.

 